Total and its shipping partners are carrying out an overhaul of two vessels the French energy major acquired when it bought Engie’s downstream LNG assets last year.
The 154,472-cbm LNG carrier Gaselys (built 2007) arrived at Malaysia Marine and Heavy Engineering in April. Data shows the vessel remains at the repair yard three months after its arrival.