German LNG terminal operator Deutsche Regas has ended its charter with the government on an Energos Infrastructure-controlled floating storage and regasification unit.

The private German operator said it has terminated the contract on the 174,000-cbm Energos Power (built 2021) with the German Federal Ministry for Economic Affairs and Climate Protection.