A third floating storage and regasification unit has arrived in Germany with a first import cargo en route from the Middle East.

Eikland Energy’s iGIS/LNG shows the 170,00-cbm FSRU Hoegh Gannet (built 2018) berthed at the new Elbehafen LNG terminal in Brunsbuttel near Hamburg.

The vessel is understood to be loaded with around 40,000-cbm of LNG which it took on in Spain.