Belgium-based Jan De Nul has won its third contract to install turbines at the Dogger Bank wind farm in the North Sea.
The shipowner will transport and install 87 GE Haliade-X 14 MW structures for Dogger Bank C — the third phase of Equinor and SSE Renewables' project 200 km (124 miles) off the UK.