A Frontline tanker has been allowed into a Libyan port to lift oil despite a wider halt to exports.
The 109,900-dwt Front Jaguar (built 2016) loaded a cargo at the Brega terminal on Thursday, engineers told Reuters.
AIS data shows the LR2 left the port earlier on Friday and was heading west en route to Southampton in the UK.