Elengy of France is offering a scaled-down project to potential capacity holders alongside its long-planned proposal to extend the life of its Fos Tonkin LNG terminal (pictured) on the south-east coast.
The GDF Suez-controlled terminal operator has launched a non-binding open season that could see the facility’s lifespan extended to 2035.
As a second, less expensive option, Elengy is now asking would-be customers at the terminal to express their interest in a more limited project that would shut the gates in 2020.
Under