• Gail (India) has relaunched bidding for a consultancy to carry out a feasibility study into plans to build a 3 million to 3.5 million tonnes per annum floating LNG import terminal in West Bengal or Orissa state.
The government-controlled pipeline player wants to install a floating storage and regasification unit within reach of its Haldia-Jagdishpur pipeline in the east.