Polskie LNG is denying reports of delays at its LNG terminalproject in Swinoujscie.

The company, the regasification subsidiary of Polish gasgrid operator Gaz-System, insists it is still on track for the terminal tostart operations in 2014.

Polish daily Rzeczpospolita reported last week thatconstruction is four months behind schedule.

However, a Polskie LNG spokesman told LNG Unlimited that thecompany is doing everything it can to reach the ultimate start-up target.

“There