Cheniere Energy is pursuing a second liquefaction plant in the US with as much as 13.5 million tonnes per annum in capacity.
The terminal developer plans to construct a bi-directional import-export facility at Corpus Christi, Texas, where a regasification proposal has been on the shelf for some time.
Cheniere subsidiary Corpus Christi Liquefaction said it will build three 4.5 million tpa ConocoPhillips Optimised Cascade trains, which will liquefy around 1.8