Brunei LNG is considering adding a sixth train at its production plant at Lumut, which came into operation almost 40 years ago.
The size and timing of the potential expansion have yet to be clarified but an exploration drilling campaign this year could find new gas fields to help underpin train 6.
Total of France is looking to produce new volumes from its offshore block B and recently spudded the third well in a six-well drilling campaign in offshore block CA-1.
Shell