Spain’s vessel schedule shows a 7.8% drop in expected LNG import volumes through the country’s terminals in August.

Data from grid operator Enagas show 3.6 million cubic metres of due next month compared with 3.9 MMcm in August 2010.

Enagas said it plans to divert one vessel from Bilbao to the Reganosa terminal at Mugardos, to prevent LNG levels falling too low.