The charter of an Awilco LNG carrier involved in a collision off Singapore last month has been terminated prematurely, the shipowner has confirmed.
The counterparty has pulled the plug on the fixture involving the 156,600-cbm WilForce (built 2013) due to the “prolonged off-hire period” required to repair the ship.