A Greek project planning to start operations of a floating storage and regasification unit at the end of 2023 expects to draw so much demand that it is preparing to secure a second LNG carrier for conversion into an FSRU.
The Alexandroupolis terminal’s developer, Gastrade, has already agreed to buy one LNG carrier — the 153,000-cbm GasLog Chelsea (built 2010).