The European Commission says Croatia’s plans to support the construction and operation of an LNG FSRU at Krk Island are “within EU State aid rules”.
The LNG terminal is designed to transport up to 2.6 bn cubic meters per year (bcm/y) of natural gas into Croatia national transmission network from 2021.