Project-hungry Dreifa Energy has costed out its plan to convert a platform supply vessel to floating regasification unit (FRU) alongside other alternatives.
In a side meeting at Gastech in Barcelona, Dreifa co-founder Jostein Ueland told TradeWinds that for a 500,000 tonne per annum market, the unit cost of using the PSV-FRU conversion model, which would be supplied in combination with a separate floating storage unit (FSU), would be slightly more than $1 per million British thermal units (MMBtu).